LG Multi Split Commissioning Procedure

Pressure Testing
All Air-conditioning systems must be pressure tested before refrigerant is released into the pipe work.
Pressure testing must be carried out using Oxygen free dry Nitrogen only and MUST be carried out on all the service valves.
If you unit has two service valve connect two pipes if it only has one port only one gauge line can be used.
Ensure that all service valves are tight